So here's the process.
![]() |
Some MDF spare bits being glued together, plus a selection of spares |
![]() |
Three Allied jump off points using Allied spare parts |
![]() |
Some Entrenchments plus the Jump-Off points assembled |
![]() |
Buildings with their first plaster coat. |
![]() |
Jump Offs, highlighted and bases washed |
![]() |
Burnt out, added bricks and details painted in |
![]() |
Side elevation |
![]() |
Th eFront |
![]() |
French farmyard outbuildings |
![]() |
The tiles are way oversize.. not fixing them now, |
![]() |
No loopholes or windows to shoot form! |
![]() |
Flocked and done |
![]() |
Flocked and done |
![]() |
Flocked and done |
![]() |
Flocked and done |
Nice work mate - great use of the spares box.
ReplyDelete